Working Principle
The conditioned sludge flows into the filter chamber from the flocculation tank and is pushed forward the discharging end. With the gap between the thread of the shaft is getting more and more narrow, the pressure on the sludge is getting higher and higher. Then the water is separated from the sludge and flows out from the gap between the moving and fixed rings. The movement of the moving rings and the fixed rings cleans the gap between them and prevent the machine from blockage. The filtered sludge cakes are pushed forward by the shaft and finally discharged from the end.
Main Features
1)Simple process, high efficiency, power saving, low investment.
2)Programme setting makes the operation convinient and accurate.
3)Exclusive flocculent helps with the dewatering performance.
4) Accurate chemical preparation and dosage saves much operation cost.
Inlet sludge Water Content
5,000mg/L~50,000mg/L
Discharge Sludge Cakes Water Content
200,000mg/L~250,000mg/L
Pre-Sales Service
* Inquiry and consulting support.
* View our Factory.
* Professional team service.
After-Sales Service
* Training how to instal the machine, training how to use the machine.
* Engineers available to service machinery overseas.
Model: TECH-101
Industry : blue algae Industry Wastewater
Solid Content of Sludge Cakes: 18%~22%
Factory in Jiading, Shanghai