Brew formula: (3 steps saccharification)
Material: Wheat or barley, hops, yeast, and water.
Steps: Milling-Mashing-Lautering-Boiling-Whirlpooling-Fermenting-Fillling
Frist, You need to prepare about 60kg-100kg malt,
The rule: Capacity( 300L)*0.2=60kg, of course, the capacity of the malt is depend on your brewing technology and your preferences.
1. Milling: Crushing the malt(within 30 minutes) to the desired coarseness to form grist.
2. Mashing: Boil the water in this tank, When the temperature 55 ℃, Start to feeding, keep this temperature to 70 minute, and then heating to 66 ℃ to keep for 80 minute, and then heating to 77 ℃.
3. Lautering: The wort will flow into the Lauter tank by pump, and the process of Lautering is about 2 hours. At this process, It will have backflow and wash the grain to make get more concentration from the wort and make wort become clear.
After the wort flow into the Kettle/ Whirlpool tank, You have to put the layer out to the grain door via rake.
4. Boiling/Whirlpool : The wort will flow into the Kettle/Whirlpool tank by pump. First, Dry hops in the beginning of boiling, and then heat up 1 hour, boil 1 hour( In this phase, you also can dry hops). Next, The wort will make Tangential whirlpool inlet to make become a vortex spinning layer, and all the impurities will concentrated in middle part of the tank. Then, the wort will pass through hops filter, make impurities precipitate, also can make wort become clear before pass through the plate heat exchanger.
5. When it finished all the process of Mashing-Lautering-Boiling-Whirlpool. The wort will pass through the plate heat exchanger for cooling, and it may need 40 minute, and in this phase, it will add oxygen for the yeast through the Air filter before the wort flow into the fermenting tanks.
Technical Parameter |
Output/Brew | 200L |
Brew/Week | 6-12 |
Output/Week | 1200L-2400L |
Electric Supply | 3phase/380 ( 220, 415, 440….)v/50/60HZ. |
Heating Source | Steam/Electric/Direct fire heating |
Area Request | >30m2 |
Brew Master | 1 person |
Notes | 1hl=100 litre, 1 gallon=3.7850 litre, 1barrel(bbl)=117 litres. |
used beer brewing equipment 200l configuration |
200L Brewhouse
Effective volume: 200L,Total volume: 250L.
Dimensions: φ860*1800mm.
Inner jacket (SUS 304),Thickness=3.0mm.
External jacket (SUS 304),Thickness=2.0mm.
Dish head (SUS 304),Thickness=3.0mm.
Insulation layer: PU-Thickness:80mm.
Heating method: Electric heating with heating tube, heating power is 18KW.
Lauter tank is equipped with plow knife (raker knife),brand is china famous brand, Power is 0.55KW.
Side mounted grain removing door, with grain guide plate, size is φ330*230mm.
Top manhole: φ250mm, round stainless steel manhole, equipped with sight glass, used for observe the filter status.
Spraying ring, make it easier and quicker to wash grain.
False bottom (filter plate), laser cutting T-wires, plate gap: 0.8mm; Material is SUS 304.
Filter method: Suction filtration by wort pump, controlled with frequency converter, brand is Danfoss.
200L Fermentation tank
Effective volume: 200L, Total volume: 250L.
Dimensions: φ760*1800mm.
Inner jacket (SUS 304), Thickness=3.0mm.
External jacket (SUS 304), Thickness=2.0mm.
Dish head (SUS304), Thickness=3.0mm.
Insulation: PU-Thickness: 80mm.
Chuck on the top of tank, diameter: φ159mm; pressure manhole design.
3pcs completely SUS304 heavy duty legs with leveling pad and legs support.
Glycol jacket: dimpled plate on cone and side.
Cooling media: glycol water or alcohol water.
Design pressure 0.3MPa, Working pressure 0.15MPa.
CIP arm with 360° coverage CIP spraying ball.
Dry hops port on the top of tanks with butterfly valve and hopper.
Mechanical relief valve, 2bar on CIP arm.
Tri clamp discharge arm with butterfly valve.
PT100 Temperature sensor for high accuracy temperature control.
500L Glycol water tank
Effective volume: 500L, Total volume: 600L.
Dimension: φ960*1950mm.
Inner jacket (SUS304), Thickness=3.0mm.
External jacket(SUS304), Thickness=2.0mm.
Side Dish head (SUS304), Thickness=3.0mm.
Insulation: PU-thickness: 80mm.
Top manhole: Diameter: φ400mm.
PT100 Temperature sensor for high accuracy temperature control.
Insulated conical top and sloped bottom.
Discharge arm with butterfly valve.
Glycol water inlet and outlet.
3HP Chiller
6000W/H (3HP).
Working power: 2.7KW/unit.
Internal compressor brand is USA Copeland.
Copland vortex compressor, more durable, cooling effect is more stable.
Refrigerant Environmental protection refrigerants Freon R404A, R410A.
Stainless steel pump for glycol water recycle.
PPR pipes and fittings assembled well.
Protector for pressure, overload, anti-freeze, delay, over-temperature, flow.
PID Instrument Panel Controller Cabinet
The material of the Control Cabinet is spray paint.
Assembling style: floor type.
Electric parts: world famous brand CE certificated.
Show and control temperature of brewhosue and hot water tank.
Show and control temperature of fermentation tank, and glycol water tank.
Control chiller, motors, pumps and solenoid valves.
The brand of temperature controller is AndongNi.
The brand of intermediate relay is Schneider.
used beer brewing equipment 200l manufacturing details |
Mirror Polishing
1.Inside Polishing: Overall polishing to 0.2-0.4μm without dead corner .
2.Outside Polishing: Mirror polishing, smooth enough and passivating treatment.
3.Purpose: The tank itself has high precision and small details of the tanks have to be observed by a telescope.
4.Function: To make tanks become tidy and smooth, beautiful and durable.
100% TIG Welding
1. All welding is is TIG welding.
2. All welding is double side welding.
3. Purpose: The use of argon on the protection of metal welding material, So that welding can not be in contact with oxygen in the air, thus preventing the oxidation of welding consumables.
4. Function: Make tanks become durable and strong.
Plow knife/Raker knife
1. Equipped in Mash/Lauter tank, use for stiring the wort, and mashing.
2. Stir evenly and fast, to make the wort generate a high concentration.
3. It's operation will be controlled by the motor and the reduciton gear.
4. Based on our brewery formula, filtration will cost 1 hour.
Plate bottom/Filter plate
1. Equipped in Mash/Lauter tank, Laser cutting T-wires, Plate gap: 0.8mm
2. This filter plate is made on a complete stainless by CNC lathe, it is strong, filter fast and leak no anty grist.
3. It's operation will be controlled by the motor and the reduciton gear.
4. Function: Use for Separating wort and impurities.
used beer brewing equipment 200l accessories and spare parts |
1.It's made of authentic stainless steel 304.So it's not only resistant to corrosion but also hygeian enough for beer production.
2.We have a great team of engineers and technicians who are proficient at welding and polishing.They can ensure the good quality of our equipment.
3.Our tanks are resistant to a pressure range of 0.15~0.3Mpa, which ensures that they will never leak.During the brewing process, the vent valves at the top of our fermenters will control the inner pressure of tanks precisely.So the brewing process will be more stable
4.All the accessories such as valves, electronic devices and pipelines are all from top brands.
used beer brewing equipment 200l pre-sales and after-sales services |
Pre-sales service
1. Customize to your detailed specifications.
2. 3D and CAD drawings available.
3. Competitive price and prompt delivery.
After-sales service
1. Main parts of the equipment 3 years warranty , long-life service.
2. Professional engineers going aboard for the installation, debugging, and technical training.
3. Brewing technology, brewing formula, can be offered available.
4. More spare parts, accessories are available to offered freely.
Contact us |
If you are interested in used beer brewing equipment 200l for pub, click the below photos, and the nyou can send the inquiry to us.
Trade Term: EXW, FOB, CIF, CFR
1.Packaging : We consider all different potential situation in the delivery, so we use every prevention measures to avoid any potential inconvenience or trouble
2.Bulk cargo: Standard wooden case which can avoid any clash during the sea or air transportation in case of causing damage to the surface of our products.
3.Container cargo: the equipment will be bound firmly and won’t easily swing to the side, or up, or down.
4.Shipping: Deliver from Qingdao port within 30-45 days after the payment.
Our company |
Shandong Shendong Equipment Technology Co., Ltd is one of the most professional beer brewing equipment manufacturer. Our used beer brewing equipment is carefully manufactured and tailored specifically to each of our customers’ needs. We can produce all kinds of beer brewing quipment that will accommodate any budget or production goal that each customer might have. The 200l beer brewing equipment including mash tun and lauter tun/brew kettle/whirlpool tank, conical fermenter/fermentation tank, small beer brewing equipment, home beer making machine, etc. For any specific information regarding our beer brewing equipment, please contact with me.
Our certificate |
We have been sold a large great number of beer brewing equipment to Euro, and USA, and other countries. There beer brewing equipment are adopted stainless steel 304/316L, and have passed the ISO CE PED Certificate, and other pressure certificate. In order to make you believe our company, now, enclosed our certificate to lessen your worries.
Our customer |
A lots of customer, they are from Euro, USA, Norway, Sweden, France, Romania, Ireland, UK, Ecuador, Indian, Czech Republic, Uzbekistan, Russian........ and so on. They pay a trip to our company and factory, to inspect the micro brewery equipment quality, processing details, as well as taste beer in our brewery, and visit some bar, brewpub, cartering center in our cisy that installed by our company. Anyway, We have a good time.
Our exhibition |
From 29th-June to 1st-July, our beer brewing equipment have been held in Nanjing Exhibition----China Craft Beer Festival. Our company dispatch lots of people to there, from engineer, technician, professional brew master, and sales person with rich experience, they work cooperate to resolve lots of kinds of problems (brewing technology, kinds of beer, installation, delivery, packaging, accessories, how to work, warranty….. and so on) for all the client who are from different countries, and we get some suggestion, and some knowledge from the client.
A:The delivery time will be within 20-30wordking days, it depends on the numbers of the tank.
Q:What's the service you can provide?
A:Provide beer production technology and brewing formula, beer brewing equipment design, installation and debugging, personnel training service; Providing CAD and 3D layout drawing.
Q:What's the beer brewing equipment warranty time?
A:Provide 5 years complete warrantee for beer brewing tanks body and life-time maintenance service; All of the accessories and auxiliaries facilities are guaranteed for one year.
Q:How to check the quality before delivery?
A: We have our professional engineers to check the beer brewing equipment quality before delivery, also we welcome you come to check the quality or let the third-party check the beer brewing equipment quality before the beer brewing equipment delivery.