Sludge dewatering screw filter press for industrial wastewater treatment plant

There is no need to worry about jam up.

Technical Feature

  • New
  • Automatic
  • 100%
  • Shanghai, China (Mainland)
  • QILEE
  • QLD202
Send Standard Inquiry Add Inquiry List

0 Add Favorite

$10~55

PRIMARY PARAMETERS

Condition
New
Automatic Grade
Automatic
Production Capacity
100%
Place of Origin
Shanghai, China (Mainland)
Brand Name
QILEE
Model Number
QLD202
Voltage
220V/380V
Power(W)
800
Weight
470kg, 470kg
Dimension(L*W*H)
2500*935*1270mm
Certification
CE ISO
Warranty
1 Year
After-sales Service Provided
Engineers available to service machinery overseas
Filter Press Type
sludge filter press
power
0.8kw
Material
SS304
Operating Type
Screw/spiral/helical
Treating Capacity(kg/h)
18~30
Sludge Flow(m3/h)
0.6~9
Water Demand for Cleaning(L/h)
64
Outlet Position(mm)
350
Size
2500*935*1270mm

DETAIL DESCRIPTION

 

 

Sludge dewatering screw filter press for industrial wastewater treatment plant

Product Introduction

 

 

 

Sludge filter press Features:

1.Suitable for sludge dewatering of high/low consistency.
2.There is no need to worry about jam up. Reduce the cleaning water consumption.
3.The electrical cabinet, disposal tank and dehydrator are integrated, which reduces the covering area and brings convenience to installment.
4.The dehydrator is enclosed working, which reduces the bad smell and improves the working environment.
5.Automatically working for 24 hours, reducing the labor strength of workers.
6.The slow running speed of screw shaft reduces the power consumption and noise.
7. It is made with stainless, extending the service life.
8. It is convenient for daily maintenance.

 

Product Structure:

The main part of the dehydrator is a filter device that a screw runs through the stacked fixed rings and moving ring.
The small gaps between fixed rings and moving ring can filter the sludge, and the lumenbetween screw and rings is filled with polymer grains. The moving ring transfers the sludge to the end of the machine with pressure and extrudes sludge cakes.
The running of the screw drives the moving ring to clean the gaps and avoid jam.

 

 

 

 

 Product Application:

•City mixed raw sewage,Food & beverage industry,Chemical industry,Leather & tannery sewage,Paper & pulp sewage,Elecro-plating sewage,Pringting & dyeing sewage,Power plant,Petrochemical industry

 

Selection of models:

Model

Ds Standard Treating Capacity

Sludge Flow

Low-high consistency

2000mg/L

5000 mg/L

10000 mg/L

20000 mg/L

25000 mg/L

50000mg/L

QLD101

~3kg/h

~5 kg/h

~1.5m3/h

~0.6 m3/h

~0.5 m3/h

~0.25 m3/h

~0.2 m3/h

~0.1 m3/h

QLD131

~5 kg/h

~10 kg/h

~2.5 m3/h

~2 m3/h

~1 m3/h

~0.5 m3/h

~0.4 m3/h

~0.2 m3/h

QLD132

~10 kg/h

~20 kg/h

~5 m3/h

~4 m3/h

~2 m3/h

~1 m3/h

~0.8 m3/h

~0.4 m3/h

QLD201

~16kg/h

~18 kg/h

~4.5 m3/h

~1.8 m3/h

~1.5 m3/h

~0.75 m3/h

~0.6 m3/h

~0.3 m3/h

QLD202

~18 kg/h

~30 kg/h

~9 m3/h

~3.6 m3/h

~3 m3/h

~1.5 m3/h

~1.2 m3/h

~0.6 m3/h

QLD301

~30 kg/h

~50 kg/h

~15 m3/h

~6 m3/h

~5 m3/h

~2.5 m3/h

~2 m3/h

~1 m3/h

QLD302

~60 kg/h

~100 kg/h

~30 m3/h

~12 m3/h

~10 m3/h

~5 m3/h

~4 m3/h

~2 m3/h

QLD303

~90 kg/h

~150 kg/h

~45 m3/h

~18 m3/h

~15 m3/h

~7.5 m3/h

~6 m3/h

~3 m3/h

QLD304

~100 kg/h

~200 kg/h

~50 m3/h

~10 m3/h

~20 m3/h

~10 m3/h

~8 m3/h

~4 m3/h

QLD352

~120 kg/h

~200 kg/h

~60 m3/h

~24 m3/h

~20 m3/h

~10 m3/h

~8 m3/h

~4 m3/h

QLD353

~180 kg/h

~300 kg/h

~90 m3/h

~36 m3/h

~30 m3/h

~15 m3/h

~12 m3/h

~6 m3/h

 

Specifications:

 

Click here for more information

 

Operation Conditions:

 

Flow Diagram:

1.The sludge in the sludge sump is carried to the measuring tank by sludge pump.And the sludge inlet volume can be controlled by adjusting the liquid level tube.
2.Sludge and flocculant will form alum floc in the disposal tank after agitator mixing, the ideal diameter of alum floc is about 5mm.
3.After gravity thickening in the thickening part, large amount of filtrate will discharge from the gaps between rings.
4.The thickened sludge is carried forward by the screw and dehydrated sufficiently under the pressure of the back pressure plate.
5.The dehydrated mud cake is discharged from the gaps between back pressure plates and screw body. The treating capacity of sludge and water content's rate of mud cake can be controlled by adjusting the running speed of screw and gaps between back pressure plates.

 

 

 

Related Products
 

 

 

FAQ
Q

How can I get the sample to check your quality?

A

After price confirmation, you can require for samples to check our product’s quality. If you just need a blank sample to check the design and quality. We will provide you sample for free as long as you afford the express freight.

Q

What can I get the price?

A

We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please tell us in your email so that we will regard you inquiry priority.

Q

What is your term of delivery?

A

We accept EXW, FOB Shenzhen or FOB Guangzhou. You can choosethe one which is the most convenient or cost effective for you.

 
Q

What about the lead time for the mass production?

A

Honestly, it depends on the order quantity and the season you place the order.

 

 

 

 

Company Information

Send Consultations Sending PUBLIC question and getting response from the supplier

Send Only your public informations will be shown

All Consultations