MVR Evaporator /Gloucose/Organic Acid/Xylose Processing Machine

Energy saving: high thermal efficiency, energy saving, lower energy consumption, the energy consumption of 1t water evaporation is about 1/5 to 1/3 of conventional evaporator.

Technical Feature

  • New
  • Distillation
  • Customzied
  • Vacuum Distillation
  • Shanghai, China (Mainland)
  • MEQJ
Send Standard Inquiry Add Inquiry List

0 Add Favorite

$1~30

PRIMARY PARAMETERS

Condition
New
Application
Distillation
Power Source
Customzied
Process
Vacuum Distillation
Place of Origin
Shanghai, China (Mainland)
Brand Name
MEQJ
Model Number
MEQJ
Voltage
220V/380V/415V
Power(W)
Customers' Requirement
Dimension(L*W*H)
Depends
Weight
200kg
Certification
ISO9001
Warranty
1 Year
After-sales Service Provided
Engineers available to service machinery overseas
Product name
Forced Circulation Vacuum Evaporator
Name
MVR
Material
SUS304L/316L/red Copper
Vacuum degree
Adjustable
Application Industries
Chemical Industry
Rotary flask
Customzied
Rotating Speed
0~180rpm
Sealing
PTFE
Main uses
Industrial Distillation
Condenser
Vertical

DETAIL DESCRIPTION

China Factory MVR Evaporator for Milk/Gloucose/Organic Acid/Xylose Processing Machine

The characteristics of MVR evaporator:

1.Energy saving: high thermal efficiency, energy saving, lower energy consumption, the energy consumption of 1t water evaporation is about 1/5 to 1/3 of conventional evaporator.
2.Environmental protection: completely get rid of dependence on steam boiler, the mechanical vapor recompression evaporator could be start-up by electricity.
3.Without boiler ,Don't need to burn coal ,A small amount of steam ,A small amount of cooling water.
The operation cost is low: due to low energy consumption, the operating cost of the whole evaporator is only 1/3 to 1/2 of traditional evaporator.
4.Small area: the system has high dense mechanical structure, so the cover area is less than 50% of traditional evaporator.
5.Mild evaporation: low temperature evaporation, the heat transfer temperature difference is low, so the system is not easy to scale.
6.High degree of automation: high degree of automation, simple operation, easy to operate.

MVR and triple effect evaporation equipment running cost compare:

 

NameMVR evaporatorTriple-effect evaporator
Steam consumption cost 0.6(material pre-heating steam consumption)t/h×180RMB/t=108RMB/h [4.0+0.6(material pre-heating steam consumption)]t/h×180RMB/t=828RMB/h
Electric charge500kw/h×0.80RMB/kw=400RMB/h160kw/h×0.80RMB/kw=128RMB/h 
Recovery of condensed water10.6t/h×3RMB/t=32RMB/h14.6t/h×3RMB/t=44RMB/h
Operation cost per hour 108+400-32=476RMB/h828+128-44=912RMB/h 
Annual operating cost476RMB/h×24h×300day=3427200RMB912RMB/h×24h×300day=6566400RMB
Annual operating cost difference:6566400-3427200=3139200RMB=$469034.35

 

Application:
The environmental protection industry
1 Industrial Wastewater
2 environmental protection salt containing wastewater
3 landfill leachate Chemical industry

1 pharmaceutical wastewater
2 the production of salt containing wastewater
3 chemical products concentrated or crystallization
    The food industry 

    Sugar, milk, extraction of glucose and amino acids concentration etc.

 

 

 

 

 

 

 

 

 

 

 

 

 

We are experienced in the whole packing and shipping process, and we will be responsible for any damage made during shipping and send clients replacements for free.

* Sufficient inner protection with different materials, including bubble bag, foam board and others.
* Qualified wooden package or carton for different products or as customer require
* Strict packing process to ensure the safety and completeness of the goods

Flexible and multiply shipping methods for on-time shipment:

* We have good cooperation with many internationl express companies such as DHL/ UPS/ FedEx/ TNT
  and other, as well as large shipping companies to provide air shipping and sea shipping.
* We can also arrange global shipment as clients' requirement.

 

1. Pre-service

24 Hours online service for your consult.
Help choose right model and a series of service, person advise.
2. After sale service
--1 year warranty service and all life maintenance.
--Technical Engineer are available for oversea training.
--Free change for some parts
--Remote control technical consult
--Maintenance plan


 

 

 

 

 

 

Send Consultations Sending PUBLIC question and getting response from the supplier

Send Only your public informations will be shown

All Consultations