WNS | WNS | WNS | WNS | WNS | WNS | WNS | WNS | WNS | WNS | WNS | WNS | WNS | WNS | |||
0.3 | 0.5 | 0.7 | 1 | 2 | 3 | 4 | 5 | 6 | 8 | 10 | 12 | 15 | 20 | |||
Rated capacity | T/h | 0.3 | 0.5 | 0.7 | 1 | 2 | 3 | 4 | 5 | 6 | 8 | 10 | 12 | 15 | 20 | |
Rated steam pressure | Mpa | 0.7 | 1.0/1.25 | 1.25/1.6/2.5 | ||||||||||||
Rated steam Temp. | ℃ | 170 | 184/193 | 193/204/225 | ||||||||||||
Supply-water Temp. | ℃ | 20 | 104 | |||||||||||||
Heat transmission area | ㎡ | 10.3 | 15 | 18 | 25 | 57 | 82 | 103 | 128 | 154 | 208 | 268 | 308 | 390 | 516 | |
Applicable fuel | Light oil,Heavy oil,Gas | |||||||||||||||
Fuel consumption | Heavy oil | Kg/h | 20 | 34 | 46 | 66 | 122.5 | 189 | 258 | 319 | 370 | 485 | 609 | 730 | 915 | 1220 |
Light oil | Kg/h | 18 | 32 | 42 | 61 | 120 | 184 | 243 | 300 | 354 | 472 | 580 | 707 | 849 | 1157 | |
Natural gas | m³/h | 21 | 40 | 50 | 72 | 158 | 225 | 313 | 375 | 452 | 627 | 770 | 926 | 1027 | 1330 | |
Coal gas | m³/h | 48 | 74 | 103 | 148 | 295 | 144 | 592 | 740 | 868 | 1185 | 1465 | 1758 | 2200 | 3073 | |
Gas pressure | Natural gas | mbar | 20-40 | 30-100 | 30-80 | 50-100 | 50-100 | 50-200 | 100-200 | 100-200 | 100-200 | 150-300 | 100-300 | 150-300 | 150-300 | 150-300 |
Coal gas | mbar | 20-40 | 50-100 | 30-80 | 70-100 | 70-200 | 70-200 | 100-200 | 100-200 | 100-200 | 100-300 | 100-300 | 150-300 | 150-300 | 150-300 | |
Total power | Heavy oil | Kw | -- | -- | -- | 7.1 | 19.4 | 21.7 | 26.2 | 27.7 | 41.9 | 57.4 | 58.4 | 58.4 | 86.5 | 118.5 |
Light oil | Kw | 0.5 | 1.86 | 2 | 2.6 | 6.2 | 8.5 | 13 | 14.5 | 19.5 | -- | -- | -- | -- | -- | |
Gas | Kw | 1.5 | 2.05 | 2.3 | 2.5 | 6.2 | 10.5 | 13 | 17.5 | 19.5 | 21.5 | 32 | 32 | 51 | 77 | |
Max.Transportation W.T. | T | 1.9 | 2.5 | 3.5 | 5.5 | 7.6 | 9.9 | 11.7 | 13.7 | 15.9 | 18 | 25.4 | 27.2 | 40 | 45.5 | |
External Dimension | L | mm | 2470 | 2950 | 3300 | 3650 | 4650 | 4650 | 4800 | 6000 | 6300 | 6500 | 7400 | 8870 | 8700 | 10000 |
W | mm | 1330 | 1570 | 1620 | 1950 | 2100 | 2200 | 2300 | 2600 | 2700 | 2950 | 3730 | 3730 | 4100 | 4500 | |
H | mm | 1500 | 1820 | 1950 | 2200 | 2450 | 2650 | 2800 | 2900 | 2900 | 3100 | 3530 | 4500 | 3800 | 5600 |
♦Unique structure design of big combustion chamber, 3-stroke all wet-back structure, super radiation heat-exchange and low temperature burning to improve thermal efficiency, reduce NOX emission and protect the environment.
♦Adoption of thread smoke tube improves heat transmission and thermal efficiency.
♦Multiple-sealing of boiler front and back smoke box prevent smoke leakage.
♦Large steam space leads to better steam quality.
♦Multiple measures of such as water level,steam pressure and smoke-discharging temperature make the boiler safe and reliable.
♦Efficient thermal protection materials ensurethe lower boiler surface temperature.
♦Boiler energy-saver of GENTLE company save the fuel cost by 5-15%, Upgrading the boiler into condenser ones.
♦Multiple-point pollutant discharging makes the heating surface of boiler cleaner.
Our steam boiler, using proprietary patented technology, high efficiency, energy saving, well-made, widely used in industry, selling at home and abroad.
1.Italy Battur Burner
The brand of the burner Is Italy Battur. we also use Rellio. There are gas burner, oil burner, and oil and gas duel fuel burner. The fuel could be diesel, furnace oil.
2.Sufficient Storage
Adopts the structure of horizontal tri backhauling , sufficient steam storage and heating surface make the boiler to generate bigger thermal power and high quality steam .
3.Smoke Chamber
Monolithic smoke chambers are used at the front and end , the smoke chamber door is split structure ,it is convenient for maintain , detect and clean .
4.Thread Smoke Tube
Advanced manufacturing process , adopt assembly line automatic work,strengthen heat transfer to improve boiler heat efficiency .
5.Fully Automatic Control
Fully automatic operation combustion, water level temperature and pressure are adjusted automaticlly and self protection .
6.Corrugated Furnace
This series boiler adopts whole corrugated furnace . Reinforce the disturbance of flue gas as well as improving the heat transfer efficiency of unit area and unit volume . increase the strength and elasticity of furnace prevent the pressure parts from being damaged because of the increase of stress efficiently during the the thermal expansion procedure.
WNS oil gas fired steam boiler is widely used in hospitals, schools, textile mills, garment factories, large supermarket, garment factories, dyeing factory, hotel, dining room, restaurant, food factory, beverage factory, soy products factory, meat products factory, cannery, brewery, pharmaceutical factory, packaging plant, building materials factory, paint factory, swimming pool and other places.
Henan gentle industry co., ltd, a R&D and production base of thermal equipment of shanghai Zhenlv Environment Protection Technology Co., Ltd, is a level-B producer permitted by General Administration of Quality Supervision, Inspection and Quarantee. Is a company specializing in the production of gas fuel steam boiler, hot water boiler, thermal oil boiler manufacturers.Gentle company covers a land of 90 mu.It focus on development of efficient, safe, enviroment-friendly and energy-saving heating equipment.Its experienced in design and development and owns domestically advanced heat-supply technology and equipment. The special equipment and production line for processing, soldering, flaw-detection and testing are comprehensive, precise and advanced.
1. What can you get from us before quotation?
A:After confirming all the details about your requirement, we will provide you with several sets of related project pictures we have done before. Once you are satisfied with our strength and our products, lets continue.
2. Below are the details need your confirmation before quotation.
2.1. What type boiler you need, steam boiler, thermal oil boiler or hot water boiler?
2.2. What is the fuel type for you boiler, biomass(coal, shell, pellet etc.), gas or oil?
2.3. What is the requirement for oil/steam temperature and pressure?
2.4. What is the evaporation capacity of boiler required?
3. How long can we get the reply with detailed information for our project?
A: For single boiler, usually you can get the detailed offer within 1 day after details confirmed; For whole set project; the time takes longer and usually 2-3 days for tentative plan and process flow drawing.
4. What is your advantages for the whole project?
A: We have been in the boiler equipment fields for many years and obtain a good reputation with the up/down partner. So we have much richer resource in different fields like the burn system PIC control instrument, raw material qualiy selecting shipping installation etc. We are comprehensive company with experiences for different fields.
5. What is warranty for your equipment and whole set of project?
A: For boiler body, we provide you with 2 year quality warranty.for all the parts of our
equipment by repairing or replacing, damage caused by human excepted. For whole project, our engineer will stay in your site for equipment installation, debugging and training till you get standard products from the equipment. If necessary, we will also help you find an engineer to work for you for 1 or 2 year for your plant management.