Extraction Condensing Steam Turbine

Respective adjustment of thermal and electric loading to meet customers' requirements.

Technical Feature

  • Shandong, China (Mainland)
  • RUNH
  • RUNH
  • Plant
  • coal fired
  • 220
Send Standard Inquiry Add Inquiry List

0 Add Favorite

$0~0

PRIMARY PARAMETERS

Place of Origin
Shandong, China (Mainland)
Brand Name
RUNH
Model Number
RUNH
Type
Plant
Electricity Generator Type
coal fired
Output Voltage (V)
220

DETAIL DESCRIPTION

Product Description
Extraction Condensing Steam Turbine:
Respective adjustment of thermal and electric loading to meet customers' requirements.

Extraction Condensing Steam Turbine detailed product detailed description:

1). Power up to 1000MW, covering various inlet and extraction conditions.

2). Respective adjustment of thermal loading and electric loading to meet customers' requirements.

3). Running under a staight condensation operation condition.

4). Rational construction, sensitive governing and smooth running.

5). Fully hydraulic and DEH governing system.

Runh Power is an EPC contractor and complete equipment supplier, which is founded in 1996. With 18 years development, Runh Power has performed more than 20 international power projects in Turkey, Ukraine, India,etc. Our service and products are highly appreciated by the owner. And we mainly own the following advantages:

1 Professional design institute:
We own independent design institute--Runh Power design institute, about 50 experienced and
professional engineers for all systems of power plant in our design institute, they could make proposals for power projects of various sizes. 

2 Cost effective equipments:
We establish cooperative relationship with domestic well-known OEMs, their products employs the most advanced ?technology and their quality could be guaranteed. And they provide equipments for us with a relatively competitive price. Besides, we have undertaken 28 international power projects which also could prove that our products and services are very competitive.

3 Competitive delivery time:
Time is very important, especially for power projects and we could guarantee and provide competitive delivery time. In order to achieve this goal, we mainly have 4 steps:
Step 1: Design, our design institute could guarantee the design schedule;
Step 2: Manufacturing, our cooperative OEMs will arrange our order preferentially;
Step 3: Local branch, we have 4 local branch in domestic, and they will manufacture the manufacturing schedule and quality of our orders.
?Step 4: Rich experienced and professional team, our team have accumulated rich experience and they could solve the problems and risks and avoild potential delays in delivery.
? ?
4 After-sales service;
Many owners worry about this, especially for international power projects and we provide complete after sales service to reduce your risks such as one-to-one service system; periodic visiting; customer documents; global maintenance team, etc.

Send Consultations Sending PUBLIC question and getting response from the supplier

Send Only your public informations will be shown

All Consultations

Runh Power Corp., Ltd.

Power Plant;Steam Turbine;Boiler;Energy Boiler;Power Plant EPC Contractor;Power Plant Turnkey Contractor;Generator;Combined Cycle Power Plant;Biomass Power Plant;Coal-Fired Power Plant

China