Eco Friendly Industrial Wood Burning Wood Pellet Fired Biomass Steam Boiler For Sale
SZL series product has a double-drum offset hearth (D-type layout), great apply for biomass fuel, environmental protection and energy conservation, and is a key promoted product of national energy-saving projects.
-Boiler Applied fuel:biomass pellet,wood pellet, wood chip, rice huskrice husk,straw, cashew, sawdust, paddy ,peanut,palm oil kernel shell,cashew nut and all other kinds of solid fuel.
-Boiler Rated capacity: packaged type 1 t/h to 8 t/h, assembled boiler 10t/h-20 t/h
-Boiler Model: SZL
-Boiler Structure: automatic chain grate, water tube, 3-pass boiler, double drum
-Boiler efficiency: 83-86%
-Boiler Output: steam
-Boiler Rated steam pressure:1.0Mpa(10bar), 1.25Mpa(13bar),1.6Mpa(16bar),2.5Mpa(25bar).
-Boiler Rated steam temperature:184°C, 194°C,204°C,225°C
-Application: Textile mill, food & beverage industry, beer brewery factory, wood industry, farm feeding mill, paper and printing mill, dyeing mill, Cocoa processing plant, medicine industry, chemical industry, etc.
Q: How can you get the best price quickly?
A: We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then we can confirm the boiler model.
Customer needs to provide us your name, email address and company name, and then we will send you price list immediately.And if you use whatsapp, skype or wechat, you can provide us your ID, it will be more convenient for our communication.
Q: Why should you believe our quality?
A: more than 60 years experience, founded since 1956; Chinese-government appointed Boiler Manufacturer.
With ISO9001certificates.
Quality control system: Include 8 subsystems, design, techonics, welding, inspection, non-destructive testing, heat treatment, materials physics and chemistry inspection, device management Each process will be strict supervised. 5 process quality point, Raw material inspection, product specimen, NDT, hydrostatic test, Heat treatment. The products must be inspected by third party before delivery.
Q: What about the installation?
A: After you receive the boiler, we will guide you to make some preparation for installation; If necessary, our expert will fly to your local place in 72 hours. The experts will responsible for guiding installation,training, trial operation.
Q:What is the using life of your boiler?
A:Normally the boiler is designed for 20 years life span, but with right operation and good maintenance,the boiler can be used for 20-25 years.