15BBL beer brewing equipment beer equipment for craft beer fermentation
Equipments Components of Beer Brewing Plant
Equipments Request | Components |
1. Milling System | Malt Miller |
2. Mashing System | Mash/Lauter Tun |
Boiler Tank | |
Boiler | |
Heat Exchanger | |
Wort Pump | |
Stiring Device (Optional) | |
Other accessories are available: 1. Ornamental Pipe; 2. Mashing Pipeline; 3. Operating Plateform; 4. Yeast Feeder; 5. Venturi Tube; 6. Butterfly Valve DN40; 7. Butterfly Valve DN32; 8. Soft Pipe; 9. Dregs Rake; 10. Sugar Measuring Cylinder; 11. Saccharimeter; | |
3. Fermenting System | Fermentation Tank |
Other accessories are available: 1. L-Pipe; 2. Butterfly Valve; 3. Pressure Gage; 4. Solenoid Valve; 5. Vacuum Valve; 6. Cooling Pipe; 7. Thermal Insulation Pipe; | |
4. Cooling System | Ice Water Tank |
Refrigeration Machine | |
Centrifugal Pump | |
Evaporator | |
Ice Water Pump | |
Relative Pipes and Valves | |
5. CIP System | Washing Tank |
Sterilization Tank | |
Pump and Valve | |
6. Filter System | Kieselguhr Filter |
Membrane Filter | |
Filtered Beer Tanks | |
7. Packing System | Fresh Keg Packing Machine |
Pop Can Packing Machine | |
Glass Bottle Packing Machine | |
8. Controlling System | Mashing Control Panel |
Fermenting Control Panel | |
Refrigerating Control Panel |
Model Capacity |
CBET-100
| CBET -200 | CBET -300 | CBET -500 | CBET -600 | CBET -1000 |
Capacity | 100L/Day | 200L/Day | 300L/Day | 500L/Day | 600L/Day | 1000L/Day |
Area Request | 18M2 | 20M2 | 40M2 | 50M2 | 60M2 | 100M2 |
Installed Power | 10Kw | 15Kw | 22Kw | 35Kw | 45Kw | 70Kw |
Steam Request |
| 30KG/Hr | 30KG/Hr | 50KG/Hr | 50KG/Hr | 100KGn/Hr |
Water Consumption | 0.4M3/Day | 0.8M3/Day | 1M3/Day | 1.5M3/Day | 2M3/Day | 3M3/Day |
One-Stop Service | (1)Free consultation service before, during, and after sales; |
(2)Project planning and design services; | |
(3)Free debugging instruction of equipment until everything is functional; | |
(4)Management of equipments' long distance shipping from seller's factory to named port or station by buyer; | |
(5)Training of equipment maintenance and operating personally; | |
(6)New production techniques; | |
(7)Provide 36 months complete warrantee for main parts and life-time maintenance service;The seller is responsible for the nature damage of the machinery in the warranty period except for man-made damage. All spare parts and wearing parts are attached with the machinery for free; |
Customers on-use field