hydro cyclone filter for power station steam boiler

The center cylinder can separate the cinder from the smoke and return the cinder which is not sufficient burning to the furnace,so that the thermal efficiency of the boiler can be improved easily.

Technical Feature

  • Shandong, China (Mainland)
  • Yuanda
  • Power Station Plant used CFB boiler parts platen superheater tubes
  • Heating Elements
  • Coal
  • cyclone dust filter
Send Standard Inquiry Add Inquiry List

0 Add Favorite

$2~20

PRIMARY PARAMETERS

Place of Origin
Shandong, China (Mainland)
Brand Name
Yuanda
Model Number
Power Station Plant used CFB boiler parts platen superheater tubes
Type
Heating Elements
Fuels
Coal
Product name
cyclone dust filter
Material
cast steel or steel alloy
Color
Customers' Requirement
Name
Power Station Plant used CFB boiler parts platen superheater tubes

DETAIL DESCRIPTION

Product Description

hydro cyclone filter for power station steam boiler

 

1. Descriptions:

Actually,the center cylinder is a place where the smoke activity is provided.The center cylinder can separate the cinder from the smoke and return the cinder which is not sufficient burning to the furnace,so that the thermal efficiency of the boiler can be improved easily.
At the present stage,except common center cylinder,we also provide eccentric center cylinder to the customers.As it turns out,it’s efficient.Based on technical calculation and user feedback,eccentric center cylinder can improve the efficiency of the boiler 5%-15%.
According to customer’s requirement,we can use stainless and alloy steel to make the center cylinder.

2. Technical Parameter:

Material

SS stainless steel

Features

higher separation efficiency

Brand

Jinan Yuanda

Remarks

Customized order is also accepted.

 

Packaging & Shipping

Standard Export Package For hydro cyclone filter for power station steam boiler;

Shipment by sea or by air,depends on the volume of goods ordered.

 

Our Services

Pre-sale service
We offer free consultation and pre-sale service to all the customers, which brings you professionalism and enthusiasm.The company has 12 years of production and sales experience.Customization is supported.once the drawing is received ,it will be discussed by our professional technical and sales team,after that the offer sheet will be send to you .
We will cooperate with you with more professional technical specification, higher product quality and more competitive price.
After-sales service
We have a professional after-sale team, we constantly sum up experience in the work, improve the quality of service, gradually formed a set of high quality after-sale service system.We will bring you 24 hours of intimate service.

Company Information

Jinan Yuanda Power Equipment Co.,LTD is a modern enterprise which produces and sells complete sets of power equipment and accessories ,1T/h-660T/h boiler parts and accessories.With the advantages of scientific research,mass production,professional technical consultation,timely delivery and installation maintenance,our products are sold all over the world.


We have provided quality and affordable products for thousands of power plants,thermal power stations and heating companies, such as Chemical plant,Textile plant,Food & Beverage,Garment manufacturing,Paper Plant,Printing and dyeing mill,Cement Plant,Fertilizer plant,Feed mills,Rubber factory.Schools,Hotel,Bath Center,Swimming Pool,Hospital,Hotel,etc.

In China,we enjoy a high reputation.We provide various kinds of boiler fittings,such as economizer,membrane water wall,super heater ,air pre-heater,boiler drum, boiler header,water cooled jacket,center cylinder,super-heater bracket,super-heater clamp,tube shield,boiler nozzle,expansion joint pipe,coal feeder,grate bar,tube bend etc.Meanwhile,boiler improvement  technical consultation,OEM and ODM is also accepted.

Boiler Spare Parts we mainly supply:

 

 

FAQ

1.Why choose us?
We are professional manufacturer on Chinese market with more 12 years experience;
Both our raw materials and finished parts are strictly inspected by our quality control department to make sure its stable performance. Because we believe that quality is our life and the basis to cooperate with each client.

2.How long is the delivery time ?
Generally speaking, it will take about 7 to 45 working days after payment. Depends on what you required is our normal standard configuration or customized model.We accept urgent orders production if needed.
3.How to order ?
Inquiry-RFQ-Quotation-Sales Order-Payment-Manufacture-Quality Inspection-Package-Delivery


4.How about the packaging?
Standard export wooden case,iron frame and other seaworthy packing.

5.How long the warranty period will be valid?
1 year.

6.How about your service ?
We will provide professional presale and aftersale service such as technical consultation for each customer.Please contact us in no time if you have any problems with the boiler .

7.How about the shipment and payment?
Shipment by sea or by air are accepted depends on the volume of goods you ordered;
Payment by T/T, Western Union,etc are accepted.

 

Certifications
Contact Us

Send Consultations Sending PUBLIC question and getting response from the supplier

Send Only your public informations will be shown

All Consultations