Bangladesh 201 202 grade stainless steel pipe production line
The Stainless Steel Tube Application:
the stainless steel tube can use in many different part,such as
1. escalator,elevator,door&rail,stair armrest
2. electronic boiler &solar energy equipment
3.airport,solar energy equipment
4. chemical process vessels,piping and heat exchangers.
Product Process:
material(stainless steel coil)→uncoiler→shear and welder→horizontal(or cage) accumulator→forming mill→TIG welder→sizing mill→rounghly straightening(turkey head)→cut off machine→run out table
The Basic Parameters:
stands of forming mill | 7 |
stands of sizing mill | 5 |
shaft material | 40CrMo |
round pipe diameter | 10-50mm |
round pipe thickness | 1.0-2.5mm |
square pipe size | 8×8-40×40mm |
square pipe thickness | 1.5-2.0mm |
ERW Tube Mill Other Model
Model | Diameter Range | Pipe Thickness | Size of Machine(L*W) |
SS30 | 6-25MM | 0.2-0.8MM | 19.5*1.0M |
SS40 | 6-32MM | 0.2-1.0MM | 20*1.0M |
SS50 | 9-51MM | 0.2-1.5MM | 21.5*1.1M |
SS60 | 12-64MM | 0.3-2.0MM | 21.5*1.1M |
SS70 | 25-76MM | 0.3-2.0MM | 24*1.2M |
SS80 | 38-114MM | 0.4-2.5MM | 26*1.4M |
SS165 | 76-168MM | 1.0-3.5MM | 32*2.3M |
SS219 | 114-219MM | 1.0-4.0MM | 32*2.4M |
This model just for you reference,the product range and thickness is adjustable,we have ourselves engineer team,can design the machine according to the customer special require. Contact us for professional service.
1.) We will send the engineer for the installation and training your workers how to operate this machine in correct way.
2.) Warranty Team
One year quality guarantee, life guarantee repair. Within quality guarantee period, except for failures caused by human error, repair parts will be provided for free. After the quality guarantee period, only charge the cost of the spare parts.
3.) We supply the pre-sell and after-sell service.
pre-sell service: workshop design, and production output design
after-sell service: installation and training, and the skilled engineer for working.
4.) We can also sent the engineer working for you serval months or 1 year. The engineer will help you to improve the output, reduce the waste and decrease the cost.
5.) We supply the pre-sell service-Design for whole project for stainless steel pipe making/ carbon steel pipe making.
6.) We will be responsible for the loading and shipping