Metal Electrical Panel Box Battery Electric Control Cabinet, C8 UPS battery cabinet.

Metal Electrical Panel Box Battery Electric Control Cabinet, C8 UPS battery cabinet.

Technical Feature

  • Guangdong, China (Mainland)
  • JL
  • C8
  • IP67
  • Control Box
  • 780*450*610mm
Send Project Inquiry Add Inquiry List

0 Add Favorite

DESIGN SERVICE OVERVIEW

Project Design Scope

Project Service Scope

PRIMARY PARAMETERS

Place of Origin
Guangdong, China (Mainland)
Brand Name
JL
Model Number
C8
Protection Level
IP67
Type
Control Box
External Size
780*450*610mm
Color
BLACK&WHITE
Material
Alloy
Output
Insulated wire
Certificate
CE, ISO9001
OEM
YES
Warranty time
3 years
Long life
Above 5 years

DETAIL DESCRIPTION

Metal Electrical Panel Box Battery Electric Control Cabinet, C8 UPS battery cabinet.

 

 

Product Description

 

Specifications

 

battery cabinet (C8) 
solar battery box C8 
size:780*450*610mm (L*W*H) 
weight:23kg 
load: 16pieces 38AH 

 

Our battery cabinet is the perfect solution for creating additional space by replacing sealed lead  acid battery, or when there is a need for a maintenance free, long lasting, self-sufficient battery back-up  solution. The cabinet comes pre-wired from the factory, ready to install. Its modular design permits  more than one battery cabinet to be mounted side by side on the same wall. Each module holds up to  20pcs 100Ah lead acid battery, Please note, the cabinet is without wheels without notice, but c1-c8 can be designed with wheels.

 

 

Packaging & Shipping

 1 piece a carton.

 

Our Services

We can provide battery cabinet with wheel or without wheel. We also can customize.

 

 

Company Information

 

JL is a leading manufacturer and exporter of Battery and Battery Cabinet. Our advanced and professional technology, complete production lines, experienced staff and strict corporate system ensure our products quality. We pride ourselves on quality products, service and pricing, and believe that the three aspects are equally important to ensure the long-term success of overseas purchasing program.

  • An excellent team which is experienced with market and has strong technical capability to customize cost effective.
  • OEM/ODM services backed by 16 years' R&D experience. 

 

FAQ

 

Will need to install the battery in accordance with the requirements for correct polarity emissions in place, messenger wire way neatly adjust to ensure that all cells in a horizontal direction. Then connect copper platoon or connect the cable to the top of the two adjacent terminals is put one by one, insert the connecting bolts, wear the nut by hand (copper platoon connection).Inspect all bore copper platoon and terminal location whether appropriate, necessary exchange copper platoon or mend the hole on the copper platoon position, ensure that after the bolt fastening may not produce stress for the column. Then use the torque wrench bolts to the required torque value one by one.
In the connection operation, be sure to use with the insulation protection of tools; Don't put the instrument or any metal objects on the top of the battery, in case of short circuit damage battery. Pay attention to keep 1 cm between each battery monomer space for heat dissipation, also is each section battery around 1 cm gap, heat dissipation, otherwise it's easy to have a hot while charging out of control and lead to battery fire

 

 

 

 

 

 

Send Consultations Sending PUBLIC question and getting response from the supplier

Send Only your public informations will be shown

All Consultations

Guangzhou JL Electronic Equipment Co., Ltd.

UPS BATTERY,BATTERY CABINET,UPS,SOLAR SYSTEM,LEAD ACID BATTERY

China

Products From Supplier