Prefabricated low cost steel structure building with sandwich panel for warehouse/workshop/plant

Tell us what you want,our sales man and designer give you the best proposal.

Technical Feature

  • GB
  • Q345steel
  • Customers' Requirement
  • Zhejiang, China (Mainland)
  • PTH
  • Steel Structure Building
Send Project Inquiry Add Inquiry List

0 Add Favorite

DESIGN SERVICE OVERVIEW

Project Design Scope

Project Service Scope

PRIMARY PARAMETERS

Standard
GB
Grade
Q345steel
Dimensions
Customers' Requirement
Place of Origin
Zhejiang, China (Mainland)
Brand Name
PTH
Model Number
Steel Structure Building
Type
Light
Application
Steel Workshop
warehouse Certificate
ISO, CE
Main structure
H type column, Z type purlin, C type purlin
steel structure Wall system
EPS/Rock Wool Panel / Corrugated Color Steel
steel structure Roof
EPS Sandwich Panel / Corrugated Color Steel
Floor/foundation
PVC / Concrate
Window
Aluminum Alloy
Door
Steel Door, Auto Rolling Shutter
Crane
With or W/O
Insulation
Glass Wool
Complement
Skylight and Ventilator

DETAIL DESCRIPTION

 

European standard large-span prefabricated

steel structural building

 

 

 

 

 

 

 

Main Parts

Item Name

Specification

Main Steel Frame

Column

Q235B, Q345B                        

H shape, Box, Steel pipe, Hot rolled steel

Beam

Q235B, Q345B 

H-beam 

Finish

 Shot blasting Sa 2.5, Zinc Rich Epoxy primer finish 100um

Supporting System

Brace

Q235B, Q345B ,  

Steel rod, Steel pipe, Angle steel. Galvanization 275g/m2

Roof Purlin

C or Z shape, Steel purlin

Wall Purlin

Q235B, Q346B

C or Z shape, Steel purlin

Roof

0.45/0.5/0.6mm corrugate steel sheet (Aluminum & Zinc coated AZ100g/m2+surface painting 20/5um)

50/75/100mm EPS,  Rock wool, PU, Glass wool sandwich panel 

Wall

0.45/0.5/0.6mm corrugate steel sheet (Aluminum & Zinc coated AZ100g/m2+surface painting 20/5um)

50/75/100mm EPS,  Rock wool, PU, Glass wool sandwich panel

Accessories

Bolts

Ordinary, High strength

Gutter

Galvanized Steel, Stainless steel

 

 

 

 

 

 

 

 

 

  

 

 

 

Click CONTAINER HOUSE for more information.

 

 

 

1.Contact us
Contact us by Phone/Email/LinkedIn/WeChat
2.Drawing and Quotation
Tell us what you want,our sales man and designer give you the best proposal.
3.Finalize contract
Finalize details for price,payment,shipment time,and sign the contract.
4.Producing
Start production upon receipt of down payment,the sales follows up the producing progress.
5.Inspection
QC team will make routine inspection in each process,and provide inspection report.
6.Packing&Shipment
Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.
7.Install
PTH provide complete installation drawing,or PTH send engineer to the site to give the installation guidance.
8.After-sale service
Anytime,any problem,our sales man and engineer will try our best to help your solve it.
 
 
FAQ

1. Do you provide on-site installation service?

1) Only large projects provide installation services

2) General projects, we can provide Installation guide service based on customers’ request.

3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.

 

2.What’s your delivery time? 

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.

 

3.How to control the quality of your product?

a. quality of the design: think about possible problems in advance and provide a high-quality design solution.

b. quality of the raw material: choose the qualified raw material

c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.

 

4. How to deal with quality problems?

Warranty is 3 years. Within the warranty period, PTH will responsible for all quality problems caused by production.

 

5. If there is a clear service life of your products? If have, how long?

Under conventional climate and environment, steel structure whole building 25 years, main structure 20 years, protecting system 10 years. 

 

6. What designs do you have in different climates (How can the products adopt to different climates)?

Strong wind region:   improve the wind-resisting ability of the internal structure.

Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.

High corrosion region: use corrosion resistant material, or paint anticorrosive coating.

Send Consultations Sending PUBLIC question and getting response from the supplier

Send Only your public informations will be shown

All Consultations