New design automatic modified starch machine,pregelatinized starch machine,Pregelatinized corn starch machine
Introduction:
Pre-gelatinized starch/Modified starch processing line can product Denatured Starch, Pre-gelatinized starch is an effective and economical fluid loss agent in water based drilling fluids, which is a starch derivative. It is not bacterial degradation when at 120℃, environmentally acceptable and non-toxic. Modified Starch can produce a thin, slick, tough filter cake and promotes faster penetration rates with reducer friction. It can be used in all kinds of drilling fluid system. Pre-gelatinized starch is also sometimes "pregelatinized" to make them easier to dissolve during product manufacture. Modified starch is widely used in oil drilling, textile, paper and food industries.
Machine Parameters:
Model | Installed Power | Power Consumption | Capacity/Output | Dimension |
KL56-II Twin Screw Extruder | 42.9kw | 30kw | 120-180kg/h | 3070x960x2050mm |
KL65-III Twin Screw Extruder | 31.3kw | 22kw | 100-150kg/h | 2600x960x2000mm |
KL70-III Twin Screw Extruder | 64.45kw | 40kw | 200-250kg/h | 3320x960x2100mm |
KL75-III Twin Screw Extruder | 79.05kw | 50kw | 250-350kg/h | 4650x1100x2200mm |
KL85-III Twin Screw Extruder | 97kw | 72kw | 350-500kg/h | 4800x1100x2300mm |
KL52-II Twin Screw Extruder | 54.3kw | 40kw | 130-160kg/h | 4500x900x1820mm |
KL75-II Twin Screw Extruder | 89.7kw | 67.3kw | 300-400kg/h | 5200x1100x2200mm |
KL90-I Twin Screw Extruder | 161.3kw | 121kw | 600-800kg/h | 5800x1200x2500mm |
Sample picture
WE HAVE RUNNING VIDEO FOR YOU,PLEASE FEEL FREE TO ASK ME!!!
1.Guarantee for one year
2.24-hour technical support by email or call
3.User-friendly English manual for machine using and maintaining
4.Free technician training for large customers.
Our factory located in Jinan, Shandong Province, China.
You can take plane to Jinan International Airport, or take high-speed rail to Jinan West Station , Jinan Station ,we will pick you up to our factory.
2.What is your payment term?
You can transfer the payment via T/T. Generally, 30% advance to start to produce, 70% balance should be paid before shipping.
3. What capacity do you want ?