Potato/Corn chips production line

Standard export carton packing, fit for multiple handing and long distance marine shipping.

Technical Feature

  • New
  • Henan, China (Mainland)
  • hl
  • HL-111
  • Biscuit
  • 220V
Send Project Inquiry Add Inquiry List

0 Add Favorite

DESIGN SERVICE OVERVIEW

Project Design Scope

Project Service Scope

PRIMARY PARAMETERS

Condition
New
Place of Origin
Henan, China (Mainland)
Brand Name
hl
Model Number
HL-111
Application
Biscuit
Voltage
220V
Power(W)
1.5kw
Weight
300kg
Dimension(L*W*H)
16000*1200*1800mm
Certification
CE
Warranty
1 Year
After-sales Service Provided
Engineers available to service machinery overseas
Material
304 Stainless Steel
Name
Potato/Corn chips production line
Usage
Sancks
Raw material
Corn , potato

DETAIL DESCRIPTION

Potato/Corn chips production line

Introduction 

This process line use potato starch , corn starch , cassava starch , wheat flour as raw material . It produce various shapes second inflating food . This line is reasonable design , high automation , extruding parameter exactitude controlled . Main extruder has high and low pressure screw , enwide the scope of raw material , reducing processing cost and modify the product quality . Main products : Tri-D , screw , shell , strip , round tube , square tube , ring , cartoon shape and sport shape etc. 

Detail information

1: Produced by single screw extruder CYS-100 , the output is 80-100 kg/h . 

2: The raw material can use potato starch , corn starch , cassava starch , wheat flour etc.

3: The production line : Installed capacity is 86 kw, Power consumption is 55kw.

4: The size of production line: 16000*1200*1800mm.

5All machine material is stainless steel 201.

6Motor , electrical devices and components , frequency converter , we have them Chinese Brand, and we also have them made in SIEMENS/ABB/DELTA ,the price is difference ,it need you order.

7: Energy can use electrical, gas , fuel. Chinese Input Voltage is 380V/ 50Hz /3, If it is different from yours , we will adjust it .

 

Packaging & Shipping

 PACKAGE:

Standard export carton packing, fit for multiple handing and long distance marine shipping.

DELIVERY TIME:

3-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.

Company Information

Zhengzhou HongLe machinery & equipment co.ltd is engaged in the development, design, manufacture and sale of meat processing machinery. Zhengzhou HongLfood machinery factory over the years adopts many new ideas, absorbs a wide range of advanced technologies worldwide as well as excellent processing and testing equipment, and takes a reliable strict quality guarantee system and an important aftersales service system to win customers' trust in the industry.

 

We have strong technical force and standard management. Our existing products are related to the meat processing industry and flour product processing industry, including frozen meat grinders, cutting machines, mixers, saline injection machines, roll kneading machines, filling machines, vacuum and surface machines and mixing trap machines, totally 20 categories of products. 

 

We are willing to join hands with customers for common development and contribute to the revitalization of the food processing industry.

FAQ

1) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority. 

2) How do you make your price?

We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.

3) Can you guarantee your quality?

Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.

4) How long does the whole procedure being worked out?

After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.

5) What about the transportation and delivery date?

Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

Send Consultations Sending PUBLIC question and getting response from the supplier

Send Only your public informations will be shown

All Consultations