Corn Starch Processing Line
Technological process
Once the cones have been broken up and the sand removed, the fruit water is separated by a decanter. The starch is then extracted followed by washing. The washing line consists of 3-phase lizzie separators in three stages working the counter-current principle, fresh water only having to be supplied to the last stage. The separators separate the starch milk into the fraction starch, fine fibers and water. In this process, sse of 3-phase technology ensures a high starch yield in top-class quality.
After the last washing stage, the starch arrives for rosewater via a buffer tank. The fine fibers leave washing in the first stage for fine fiber screening. The washed and concentrated starch milk is decorate and then dried by decanters. The fine fibers and the pulp from the extraction screens are decorate by a decanter. The decorate pulp can either be dried or extracted from the process and used as a feed immediately downstream of the decanter.
We provide corn starch production line with turnkey service including workshop design/installation/training. We have experienced engineers for oversea service.
Our Company
Henan Huatai Cereals And Oils Machinery Co.,Ltd. was founded in 1950,whcih is a large-scale oil machinery manufacturing enterprise integrating R & D, design, manufacture and installation as one of the major grain and oil machinery manufacturing enterprises in China.Our company headquartered located in Huaxiang County Industries,Henan Province,China,covering 100,000.00 square meters.
Huatai machinery has developed projects including large scale oilseed pretreatment and pressing, oil extraction, oil refining and oil fractionation production line project,conveyor equipment project,corn/maize flour, grits, germ milling machines and corn processing lines,biodiesel technology,cottonseed, rice bran and soybean protein technology, and Palm Oil processing lines,etc.
Our company always put the interests of customers and product quality to the first place, and always adhere to the"no best, only better" as our purpose. We will be commitment to provide high quality products with perfect site services and after-sales service. Now the specific commitments are as follows:
field installation debugging.
8. After the equipment field assembly and installation, we will be also responsible for the single equipment debugging, online debugging and Feeding trial operation,to ensure that equipments can normal operate in full load conditions. We will provide all kinds of information and records according to the requirements of the bid.The qualified completion files will be provided to customers according to their requirements within one month after acceptance.
9. In the warranty period, all because of the quality of products has caused the damage or failure of
equipment,suppliers will take the responsibility for the free repair and replacing spare part.
Due to the damage caused by the customer,we only charge material costs for repair and replacement. After the receipt of customers notice,we will suggests the method to solve problem within six hours,or send specialist to the site to solve the problem within twenty four hours.
Contact us