Automatic coffee dry powder filling packaging machine/production line
Feature of Automatic coffee dry powder filling packaging machine/production line :
1. Automatic powder filling line includes: bottle machine → automatic feeding machine → single head powder filling machine → capping machine (or sealing machine) → bottle aluminum foil sealing machine → labeling machine → inkjet machine → Chain conveyor belt → packing platform, according to the requirements of the product selection pipeline configuration;
2. The entire production line of the machine for the appearance of all stainless steel, all the machinery structure are in accordance with the selection of food and drug hygiene standards;
3. The whole line of equipment according to GMP standard design, fully meet the national food and drug health requirements. The real line of the fully automated action to ensure that the entire production process will not contact the product staff, the production process is completely transparent and more reliable;
4. And the material in contact with the inner wall of the container are polished, often wash the structure of the use of easy to split pieces of connection to ensure that shift or change the product when dealing with hygienic convenience;
5. To the factory site survey, field design the best production program; free production line of other aspects of technical support.
Technical Parameter of Automatic coffee dry powder filling packaging machine/production line :
Model:AT-F-L
Filling range: 10-2000 g
Filling speed: 0-40 bottles / min
Applicable bottle diameter: 30-100mm (> 100mm to be customized)
Cap size: 15-100mm
Measurement Accuracy: ± 1%
Working voltage: 380V
Machine net weight: 1500kg
Machine size: length × width × height (6500*1500*2200) mm
Packing: inside plastic bag, outside wooden case for poultry feed pellet making machine (Based on the customers' need adopt the wooden case or wooden pellets, etc.).
Transportation: shipping, train, express or upon clients' demands.
- With all the technical advantages,we promise customer one year warranty.
- Low price spare parts provide beyond warranty period.
- zhengzhou hongle is your best partners!
1. Installation and Debugging: Within the time of warranties, the seller will send the engineer to guide to install the machine, the buyer should prepare the materials needed and should be responsible for the engineer’s safety, travel expense, accommodation abroad. And shall pay the salary for the engineer,150 dollars per day, and if the installation would exceed one month, then the buyer shall pay the engineer 200 dollars per day for the exceeding time. And the seller will provide the Instruction Manual and the Foundation Drawings.
2. The quality assurance date is one year (exclude the quick wear parts) after commissioning, but not exceed 15 months from date on which machine leaves the factory.
3. If the equipment appear the equipment failure because of improper handling
of user, we are in charge of maintenance, and collect the appropriate cost.
4. We offer the components with favorable price, perdurable maintenance.
After quality assurance date, if the equipment needs to be repaired, we only collect the cost price
Zhengzhou hongle Machinery Equipment Co., Ltd has been designing, developing, manufacturing and marketing Machinery for more than 12 years.After these years of development, we have high quality professional teams, skillful talents, strong technical force, strong and independent research and development capabilities, advanced production equipment and a perfect aftersales service system. So choose us, equaling to choose the competitive price and stable quality both.
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.
5) What about the transportation and delivery date?
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.