Construction Process:
2. Solidground: according to solidground condition to polish, mending, clear dust etc
3. Epoxy first primer coat: use strong adhesion sealed epoxy primer roller 1 layer, enhance the surface adhesive force.
4. Laying fiberglass cloth: put the fiberglass cloths levelling, use adapted floating coat paint to paster the fiberglass on the ground, use trowel make the floating coating smooth to let the paint film evenly, enhance the flexible of the floor. According demand to painting 1 or 2 or 3 times
5. Epoxy floating coat: Use trowel to make the epoxy resin evenly, painting 1 to 3 times
6. Finish coat: Epoxy self-levelling finish coat trowel 1 times, after finished the whole surface shining and cleanly, color evenly, no bubbling.
7.Finished construction: only allow people step on it after 24h, heavy press after 72h.
8.Construction way: roller, brush, spraying
Item NO. | Name | Description | Features | Application |
HG25 | Fiberglass anti-corrosion floor paint | HG-25 is made by solvent-free epoxy resin main surfactant and curing agent, pave and paste fiberglass fabric to form a press-resistant,anti-corrosion floor coat Thickness: Over 1.5-3mm Usage time: Over 5years | With fiberglass, strong tensile resistance, anti-crack, antileakage, Shock resistance, enhance paint flim flexible, mildew proof, anti-corrosion, odourless, safty. | General chemical pool and tower anti-crack floor, pharmaceutical workshop, eletric power plants, non-ferrous metal factory, food factory, electroplating workshop, circuit board etc. |