Reverse Osmosis Pure Water Treatment machine system
water purification line
water purifying treatment line
water purifier machine
B.Introduction
No.1 What about the backwash/cleaning system ? |
In our machine we have the backwash system,with the valves in the filter to control the water flow direction , to finsh the filter or backwash process |
No.2 Where is the pump ? |
The raw water pump is with China Nanfang brand, with water flow capacity required ,normally with SUS304 material.If with special pump brand , pls let us know |
No.3 What about blockage ? |
Before the water into the tank , and before the water out of the tank , there is water distributor, which will stop the big particals.Avoid the situation of blockage. |
No.4 What about the intermediate fitting & valves ? |
The pipeline and valves are stainless steel material with SUS304 |
No.5 What about drain water fittings ? |
For the quartz sand filter, active carbon filter, sodium filter, precise filterm , reverse osmosis device , each one with drain water pipeline |
NO.6 RO device Membrane brand ? |
Hydranautics |
NO.7 How long to change RO Ultrafilter membrane And precise filter membrane ? |
Every 3-6 month change the precise filter membrane inside . |
For RO membrane,It decided by Raw water analysis , such as if TDS is 0-300 , two year change one time . If TDS is more than 500, half an year change one time. |
C.Picture show
(1) Raw water tank & Quartz sand filter & Actived carbon filter & Sodium filter & Precise filter
(2) RO treatment system
(3) RO device--Ozone sterilizer-UV sterilizer-Whole machine outlooking
D.Related machine for water filling line
(a).PET bottle blow molding machine
I: Large mold volume: Our machine have different model for different volume bottle |
II: Capacity: From 100BPH--4000BPH(5 gallon),1000-10000BPH(10ml-5L) |
III: Simply and flexiable: to blow difference neck is easy and costless with our machines. |
IV: High standards: FESTO value and SIMENS PLC. |
V: Precision: Each hole's tolarance less than 5mm, to gurantee high speed working. |
VI: Water cooling system: no need extra water chiller |
VII: Duriable : all the moving parts is using cooper, copper is sofer then steel ,and oil is auto lubricated. |
VII Advanced: the heating 's tempeatureis automatic adjusted according to the outdoor's tempeature, there is no need manually setting each day each monent |
(b).Beverage filling machine
Feature : |
1.All 304 stainless steel rinser heads, water spray style inject design, more save water consumption & more clean. |
2.High precision filling nozzle, PLC variable signal control, ensure high filling precision & filling smoothly & steadily. |
3.Place & capping system, electromagnetic capping heads, with burden discharge function, make sure minimum bottle crash during capping. |
4.No bottle,no filling, no capping and Automatic stop when lack of bottle |
(c).Packing machine--Bottle dryer
1. Dryer the bottle after bottle warmer with high pressure air, and prepare for the labeling. |
2.The machine is a necessary part of the filling machinery. Its function is caused by high-speedwind. |
3. The high-speed wind blows into air trunk and causes wind tunnel effect. enhance and maintain a high wind speed, air ducts can easily adjust devices according to bottle / tank diameter and height so that it is more efficient and can adjust more easily. |
4.Air ducts are made of (in accordance with food hygiene requirements on material) 304 stainless steel. |
5.It is widely used in the bottle water/drinks production plant, when finished filling, before going to the shrink labeling machine, there may some water on the bottles, so it need the bottle dryer to make the bottle dry, then it can be going to the shrink labeling machine. |
(d).Packing machine--Ink jet code machine
1.Printing producing date, expiry date , company logo, etc. on the bottles as required. |
2.Lines of printing: Up to 3 (7x5, 7x7) |
3.Variable characters/languages/logos/fonts printing |
4.Timing and counting printing |
5.Automatic show of products counting, batch numbers, shift numbe |
(e).Packing machine--heat shrink film packing machine
Heat shrink film Feature: | 1) PLC programmable procedure control system, with colorful touch-screen control panel |
2)Bottle entering, Auto unscrambling bottle, Pushing bottle, Heat sealing-Saw cutting, Pressing PE, Shrink, Cooling automatically | |
3)Capacity is adjustable through adjust the convey speed | |
4)The height of the conveyer shall be made towards client's demand, can handle 6, 9,12,15, 18, 20, 24 bottle per package | |
5)Double air blowers, guarantees the temperature balance in the shrink stove with PAD temperature controller that apparently saves energy. |
(f).Carton box packing machine
1).Stable performance and precise control. |
2).Shrinking and cooling shaping automatically. |
3).Speed adjustable for the convey motor. |
4).Advanced Helical air circulation structure, three layer of heat insultation treatment, and energy saving. |
5).Strengthened cooling shaped tunnel, which can shaped the package quickly and transported convenie |
E.How to install and pipeline connected
Before we send machine to your esteemed company , we will have stickers in order to help customer install easily and do not required to engineer go aboard.
F.FAQ
1.Q:How about the spare parts: |
A:We will send one year enough easy broken spare parts together with the machines , shipping together. During the warranty time , we will supply the spare parts with our cost including the delivery fees. |
2.Q:How long time for installation |
A:According your machine order , our production department will send one or two engineers to your plant , it normally take 30days. |
3.Q:How to install my machines when it arrives ? How much the cost ? |
A: 1We will send our engineers to your factory to install the machines and train your staff how to operate the machines. 2The visa cost, local housing, food and transfer cost at customer factory paid by the customer. Installment USD60 day person as allowance. 3Training fee is free for customer's workers within the installation period. |
4.Q: When can I get my machine after I paid |
A:Normally production time is around 30days , the exactly depend on what kind of machine you order. The shipping time is based on your destination port. |
5.Q:What's your guarantee or the warranty of the quality if we buy your machines? |
A: We offer you high quality machines with 1 year guarantee and supply life-long technical support. |
6.Q: Are you a trading company or a manufactory ? |
A: We are a manufactory , we supply the factory price with good quality , welcome to visit ! |
7.Q: As a new beverage factory , what is needed to prepare for the machine running? |
A: Factory building , raw water place, electric. Our company can totally supply Turnkey project , including cable control system , Pollutant discharge system, all the machine connection and installation , train customer worker. |
F.About our company
CHINA ZHANGJIAGANG ASIASTAR BEVERAGE MACHINERY CO.,LTD
Zhangjiagang ASIASTAR Beverage machinery CO.,LTD. As one of the major beverage machine manufacturer in china , was established in 2000,We are professional in producing various kinds
of filling machine , capping machine and other kinds of packing machine both for liquid and semi-liquid.
With more than 10 years producing and exporting experience , we can offer complete solution to design , manufacture , pack , transport , install ,main the beverage packing machines according to our customer's requirement.
Our company's main products are as including
(a).water treatment system |
(b).250ml-5gallon water filling machine |
(c).carbonated drink filling machine |
(d).juice filling machine |
(e).PET bottle blow molding machine |
(f).sleeve label machine/adhesive label machine/hot melt glue labeling machine |
(g).heat shrink film packing machine |
(h).carton box packing machine |
Welcome your esteemed company consult us about our machine or make inquiry for us !
G.Payment and delivery
Before pay deposit | Pay 30% as deposit by T/T --Prepare machine--bottle cap sample send for our company--Machine will work first in our company and using your bottle sample |
When pay deposit | Quotation send--order confirm --Proforma Invoice and contract for your esteemed company |
After pay deposit | Take some videos about machine running and working or your esteemed company come our company see it --the balance 70% payment will be cleared before shipment-- After machine arrive in your company , our engineer will installation in your company untill machine can work successfully and stably. |
H.Contact us
Sweep Pictures's QR , you will receive our reply quickly !