Industry Power Control Enclosure Electric Cabinet

1. Product Name:Industry Power Control Enclosure Electric Cabinet2. Product DetailsOverview Quick DetailsPlace of Origin:NANJING, China (Mainland)Brand Name:AUBOModel Number:OEMProtection Level:IP54Type:Control BoxExternal Size:Customer RequestMateri

Technical Feature

  • Shenzhen, China
  • 50000 PCS / Year
  • L/C, T/T, Paypal
  • Distribution Box
  • Fixed Board
  • ISO9001:2000, CCC
Send Standard Inquiry Add Inquiry List

0 Add Favorite

$1~50

PRIMARY PARAMETERS

Model NO.
electricity distribution cabinet
Application Range
High-rise Buildings
Shell Material
Stainless Steel
Shell Protection Grade
IP56
Brand
Shenrong Electric
Trademark
SHENRONG ELECTRIC
Transport Package
Normal Exporting Package
Specification
AC360V or AC660V Distribution Cabinet
Origin
China
HS Code
8537109090

DETAIL DESCRIPTION

1. Product Name:
Industry Power Control Enclosure Electric Cabinet

2. Product Details

Overview Quick Details

Place of Origin:NANJING, China (Mainland)

Brand Name:AUBO

Model Number:OEM

Protection Level:IP54

Type:Control Box

External Size:Customer Request

Material:Stainless Steel

Certificate:ISO CE ROHS

Application:Electric

Product Name:control cabinet

Customization:YES!!

Color:Customer Request

Usage:Electric Usage

Size:Customer's Requst

OEM:Supprot



Packaging & Delivery

Packaging Details:

Each product has a small packaging,The packing box can also be produced as customer requirements. Carton is export standard carton.

Delivery Detail:

15-30 days


Product Description

electric PLC control cabinet/box/enclosure

1.We can make cold storage to implement the intelligent of the PLC control and humanized operation.

2.The product equipment with phase-lack protection,phase protection,voltage protection,oil temperature,liquid level,high-low pressure,motor overload,protective module,flow protection,idle away protection etc.Can automatic process according to protect grade,alarm,can achieve sound and light alarm to remind users.Equipped with fault interlock and remove logic interlock  program,can guarantee to a compressor failure of other compressor can still run normally.

3.Parallel unit can automatically balance each stage compressor's running time,according to the related parameters such as pressure and temperature range,automatically control number of the compressor,to make it running in the best and most efficient way.save operation cost,also can make the compressor life extended by more than 30% on average.

 
4.We adopt Siemens PLC and color touch screen to guarantee the quality of control system to make the system running efficiently.We can also provide customized controller.

 
5.According to the customer's demand,we can make remote control,you can control the whole refrigeration system in your office,We can also make the remote control in the mobile phone.


6.Unit parallel can adjust the quantity and working time of compressors automatically to meet different thermal load.When thermal load of the frozen food is big it will adjust more compressors to work when the thermal load is small it will adjust one compressor to do refrigeration.

3. Pictures as below: 

Industry Power Control Enclosure Electric Cabinet
Industry Power Control Enclosure Electric Cabinet
Industry Power Control Enclosure Electric Cabinet
Industry Power Control Enclosure Electric Cabinet
Industry Power Control Enclosure Electric Cabinet
Industry Power Control Enclosure Electric Cabinet



 

Send Consultations Sending PUBLIC question and getting response from the supplier

Send Only your public informations will be shown

All Consultations

Shenzhen Rongdian Enterprise Co., Ltd.

Switchgear;Transformer Substation;Distribution Electricity Box;Distribution Electricity ...

China

Products From Supplier