Product Feature for industrial chiller air cooled water chiller:
1. Air-cooling chiller without the cooling tower. Dust and filth can enter the tower easily,. Which may result in jam in water circuit, and lower down its cooling capacity.
2. Air-cooling chiller is an ideal choice for places with much dusts and filth.
3. Air-cooling chiller is suitable for area with low-quality water. And it can save the cooling tower and auxiliary devices.
4. Its large-capacity condenser operate well in even very hot seasons.
SPECIFICATIONS FOR industrial chiller air cooled water chiller | ||
Cooling capacity | USRT | 15.8 |
KW | 55.44 | |
Kcal/h | 47670 | |
Condenser | Type | red copper pipe socket string aluminum wing piece |
Air flow | 20000m3/h | |
Evaporator | Type | Water tank or shell and tube |
Water tank capactity | 510L | |
Freezing water flow | 9.55m3/h | |
Compressor power | KW/HP | 19.64kw/20hp |
Voltage | 220v-240v-380v-400v-415v-575v-50/60Hz-3phase and others | |
Refrigerant | R22/R407/R410/R134A | |
Diameter of pipe | 50DN | |
Built-in power | 2HP | |
Weight | 830KG |
Machine Parts for industrial chiller air cooled water chiller
Name: Compressor
Brand: Copeland
Original: America
For the scroll compressor, we have Copeland, Hitachi, Panasonic brand. They are all newly, we never use the second-hand parts.
Main Features for industrial chiller air cooled water chiller
Name: Electric parts
Brand: Schneider
Original: France
Machine Parts for industrial chiller air cooled water chiller
Name: Controller
Brand: Punp PLC Control System
Original: Taiwan
Main Features for industrial chiller air cooled water chiller
Name: High/Low pressure gage
Brand: Tongsheng
Original: China
Pre-Sales Service
* Inquiry and consulting support.
* Sample testing support.
* View our Factory.
After-Sales Service
* Training how to instal the machine, training how to use the machine.
* Engineers available to service machinery overseas.
1. Packing Details for industrial chiller air cooled water chiller : at first use the bubble film to pack the machine, then use the thick wood as the foundation to fix the machine, at last use the plywood to pack the machine.
2. Delivery Details for industrial chiller air cooled water chiller: standard requirement machine is about 7days, and some small machine we have stock, if the voltage is no-standard, it needs about 15-20days.
Together, we make it better!
Q: Are you trading company or manufacturer ? A: We are factory. Our factory manufactured the machine from 1985 year. |
Q: How long is your delivery time for the air cooled scroll chiller? A: Generally it is about 7-15days. |
Q: What is your terms of payment ? A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment. T/T, Alibaba trade assurance, Western Union, L/C |
Q: What is your trade terms ? A: EXW, FOB, CIF, C&F, DDU... |
Factory
Office
Our Office
Warehouse
Our Warehouse
Team
Our Team
From Brazil
From Kenya
From Kazakhstan