Product Description
A pressure diffential should be maintained between the operting environment and the isolation layer to keep the cleanliness of operating room.
Due to leaks and the opening of the entrance and other factors,it will reduce the pressure in the clean room,Starwin sensor can monitor this change,and send the singal to the control center,start the booster fan for clean room pressurization.
Specifications
Specifications | ||
Electrical Data | Input Signal | 15-24V/DC |
Output Signal | 0-5V; 0-10V; On-off output | |
Environmental Data | Temperature limit | -40~+120ºC |
Work temperature | -20~+85ºC | |
Physical Data | Response time | Adjustable |
Process connections | PG9 | |
Display | 4 digital LED | |
Mounting Orientation | Vertical | |
Service | Air o non-combustible | |
Diaphragm material | High-performance silicone | |
Housing material | Engineering plastics PC | |
Ordering Info. | Pressure specifications | 0-30Pa, 0-60Pa, 0-100Pa,20-200Pa, 50-500Pa, 100-1000Pa |
Accuracy | ±1% FS | |
Approval | CE, ROHS |
Characteristicas
• No calibration, zeroing
• No accuracy attenuation with long-term use
• Wide temperature compensation range
• High overload capacity
• Variety of detection range selectable
• Quick response
• Suitable for extreme environment
• Quick response
Our services
1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. After sending, we will track the products for you once every two days, until you get the products. When you got the
goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer
the solve way for you.
Our certifications
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 20 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.